A demolition job goes smoothly when the site is ready before the crew arrives. Use this checklist to prepare a house, commercial building or industrial site for demolition in NSW.
How to use it: print this page or save it as a PDF, then tick each item on site. Free to use and share.
1. Approvals and Paperwork
Approval pathway confirmed with your certifier or council (DA or CDC)
Conditions of consent read and shared with the contractor
Demolition contractor’s licence and insurance checked
Neighbour notification and any dilapidation reports arranged
2. Hazardous Materials
Hazardous materials survey completed (asbestos, lead paint, PCBs)
Asbestos removal by a licensed removalist scheduled before general demolition
Clearance certificate obtained after asbestos removal
3. Services
Electricity, gas, water, sewer and telecoms disconnected or made safe by the relevant providers
Underground services located (BYDA plus private services)
Temporary power and water arranged if needed
4. Site Set-Up
Site fencing, signage and safe pedestrian routes in place
Traffic management and truck access planned
Trees and structures to be kept are identified and protected
Dust, noise and sediment controls ready
5. Waste and Handover
Waste classified and licensed disposal facilities confirmed
Recycling of concrete, brick and steel planned
Final site levels and condition agreed
Waste dockets and clearance documents collected
General guidance only. Always follow your consent conditions, your certifier’s advice and current SafeWork NSW requirements.
Grana Works Pty Ltd · 0450 870 482 · granaworks.com.au · ABN 79 690 722 340
Planning a Demolition?
Grana Works provides demolition, civil works and excavation across Greater Sydney and surrounding areas.