Potholing Sydney: Expose and Confirm Underground Services
Potholing in Sydney with non-destructive digging: small, targeted holes to expose underground gas, water, electrical and telecoms services and confirm position and depth before mechanical digging. Arranged and managed by Grana Works with specialist partners.
Potholing in Sydney, Using Non-Destructive Digging
Before a bucket or auger goes in the ground, project teams need to know where gas, water, electrical and telecoms services actually sit. Potholing opens a small, targeted hole with non-destructive digging so each service can be seen, measured and photographed. Grana Works organises and manages that work with specialist partners, and you have one point of contact from the first enquiry to handover.
Potholing sits under non-destructive digging, hydro excavation and vacuum excavation in Sydney. Hydro excavation uses pressurised water to loosen the soil and a vacuum to lift the slurry away. Air vacuum excavation is the other common method. The right one is chosen for the ground and the services on each job.
What a Potholing Job Includes
Plan from BYDA plans – Before You Dig Australia plans are reviewed with your project team before anyone digs
Expose the service – A small NDD hole is opened so the asset can be seen, not guessed at from the surface
Measure and photograph – Position and depth are recorded for the design or excavation that follows
Slurry disposal arranged – Spoil is taken away by specialist partners to a suitable receiving facility
Handover – The hole is left protected for the next trade, or reinstated as agreed in the quote
Recent Potholing Work
Photos from recent jobs will be published here once we have permission to show them. Message us on WhatsApp and we can send relevant examples with your quote.
How a Potholing Job Runs
1. Enquiry – send the dig locations, expected services, depths and BYDA plans if you have them
2. Plan – BYDA plans are checked, the method is chosen (hydro or air) and access is confirmed with you
3. Locate and expose – services are marked and each agreed point is opened with NDD so the asset can be seen
4. Record – positions and depths are photographed and measured for the project
5. Dispose – slurry disposal is arranged through specialist partners
6. Hand over – excavations are reinstated or left protected for the next trade
What Affects the Price of Potholing
Number of holes, and the depth of each one
Ground conditions and access for the vacuum equipment
How close the work is to live services or structures
Slurry or spoil disposal requirements
Timing, including any site windows you need us to work within
We do not publish fixed prices. Send the site address, the number of points and any plans for a written quote.
Potholing is arranged across Greater Sydney, the Illawarra, the Central Coast and NSW port sites, from our base at 19/55 Anderson Road, Smeaton Grange. Local pages: NDD Parramatta and NDD Blacktown. See all service areas or check your suburb there.
Potholing is a small, targeted non-destructive dig used to expose an underground service so its position, depth and condition can be seen, measured and photographed before mechanical digging starts.
Is potholing the same as NDD? +
Potholing is one use of non-destructive digging (NDD). NDD is the method, using hydro excavation or air vacuum excavation. Potholing is the job of opening a small hole to confirm a service. Slot trenching and other NDD work can also be arranged.
Do you work from Before You Dig Australia plans? +
Yes. Work is planned from Before You Dig Australia (BYDA) plans. NDD is then used to physically check the assets shown on those plans, and can find services that are not shown. Positions and depths are recorded for the project.
What happens to the soil or slurry? +
Slurry or spoil disposal is arranged as part of the job, through specialist partners, to a suitable receiving facility. Tell us about the ground and any known contamination when you enquire.
Can you do slot trenching as well as single potholes? +
Yes. Potholing confirms individual services. Slot trenching can be arranged where a run is needed close to existing assets, and trenching and pit excavation can follow once services are confirmed. Scope is agreed for each site.
Managed End to EndSpecialist PartnersWhatsApp First
Managed by Grana Works.
Potholing arranged and managed for you through specialist NDD partners · Planned from Before You Dig Australia plans · One point of contact.